Consultation

Public Information Centre #1

A Public Information Center (PIC) was held in December 2017 and presented information on the recommended Detail Design Plan, construction staging details, and proposed mitigation measures to address potential environmental effects.  

Click on the links below to download a copy of the Display Panels and Roll Plan presented at the PIC. 

Public Information Centre #2 (Virtual)

As noted above, a PIC was held on December 18, 2017 which introduced and discussed the overall project. PIC #2 was held online through the project website and discussed Contract 2.

Contract 2 covers the works along QEW from east of Cawthra Road to west of Etobicoke Creek and was the focus of PIC #2. The Contract 2 project limits are located in the City of Mississauga and Region of Peel.

PIC #2 was held online through the project website. The purpose of the PIC #2 was to present and receive input on the recommended Detail Design plan, construction staging details, and proposed mitigation measures to address potential environmental impacts.

On June 24th, 2021 from 4:00pm to 6:00pm, the Project Team hosted a Virtual Public Information Centre to present information for Contract 2 followed by a question and answer period.

PIC #2 Video

English transcript of the video is available.

Questions about this content? Submit them below and we will work to address your questions in a timely manner.

PIC #2 Materials

The following PIC #2 materials are available below for review and download:

Public Information Centre #1 Summary Report

Click on the link below to download a copy of the PIC Summary Report.

Public Information Centre #2 Summary Report

Coming soon

Meetings

Consultation with municipalities, regulatory agencies, Indigenous Communities, and other interest groups are being undertaken during this project and will focus on data collection, design details, construction staging plan, and the development of mitigation measures to avoid or reduce potential impacts.

Design and Construction Report (DCR) #1

A Design and Construction Report (DCR) was prepared for Contract 1 (QEW from west of Etobicoke Creek Bridge to The East Mall) which documented the study process, design details, environmental impacts and mitigation measures, and a summary of consultation undertaken.

The DCR was available for a 30-day public review period commencing March 22, 2018. A separate DCR will be prepared for Contract 2 (QEW from west of Cawthra Road to west of Etobicoke Creek Bridge) at a later date.

Click on the link below to download a copy of the DCR for Contract 1.

Design and Construction Report (DCR) #2

A Design and Construction Report (DCR) was prepared for Contract 2 (QEW from East of Cawthra Road to West of Etobicoke Creek) which documented the study process, design details, environmental impacts and mitigation measures, and a summary of consultation undertaken.

The DCR is available for a 30-day public review period commencing September 23, 2021.

Click on the link below to download a copy of the DCR for Contract 2.

 