Public Information Centre #1

A Public Information Center (PIC) was held in December 2017 and presented information on the recommended Detail Design Plan, construction staging details, and proposed mitigation measures to address potential environmental effects.  

Click on the links below to download a copy of the Display Panels and Roll Plan presented at the PIC. 

Public Information Centre #2 (Virtual)

As noted above, a PIC was held on December 18, 2017 which introduced and discussed the overall project. PIC #2 is being held online through the project website and will discuss Contract 2.

Contract 2 covers the works along QEW from east of Cawthra Road to west of Etobicoke Creek and is the focus of PIC #2. The Contract 2 project limits are located in the City of Mississauga and Region of Peel.

PIC #2 is being held online through the project website. The purpose of the PIC #2 is to present and receive input on the recommended Detail Design plan, construction staging details, and proposed mitigation measures to address potential environmental impacts and the Project Team welcomes your input.

On June 24th, 2021 from 4:00pm to 6:00pm, the Project Team will host a Virtual Public Information Centre to present information for Contract 2 followed by a question and answer period. During the virtual PIC, questions can be submitted through the Zoom Q&A function or through our toll-free telephone line, 1-855-418-9454. Any questions the Project Team is unable to answer during the virtual PIC will be answered after the event. Beginning on June 17th, 2021 details regarding PIC #2 will be made available on the project website, including the PIC #2 presentation slides and the ability to submit comments in advance of the PIC #2. This is also an invitation to submit your questions.

Date: Thursday, June 24th, 2021.

Registration: In order to attend the virtual PIC, members of the public must register in advance. Registration will be available until the end of the virtual PIC – 6:00pm on June 24th, 2021. Alternatively, if you are unable to join the virtual PIC, you can still view all the materials online and submit your comments following the virtual PIC.

Register now!

PIC #2 Video

English transcript of the video is available.

Questions about this content? Submit them below and we will work to address your questions in a timely manner.

PIC #2 Materials

The following PIC #2 materials are available below for review and download:

If you have any accessibility requirements in order to participate in this project, please contact one of the Project Team members through the Contact Us page.

Renseignements en français disponibles en composant le 1-(705)-669-4709 (Amy Ingriselli) ou amy.ingriselli@aecom.com.

PIC #2 – How to Submit Comments

To obtain additional information, provide comments, or be placed on the project mailing list, please use one of the methods below. Alternatively, if you are unable to join PIC #2, you can still view the materials online and submit your comments. PIC #2 comments can be submitted from June 17th until July 23rd, 2021.

Note: there are a few avenues for you to submit comments, please choose which method is best to meet your needs:

An Electronic Comment Form (fillable form which can be filled out and submitted automatically online)

A Printable Comment Form (can be printed and filled out by hand). The form can also be downloaded, saved and filled out at a later date (before July 23rd, 2021) and either emailed back to the Project Team at ProjectTeam@QEWDixieDetailDesign.ca, or it can be mailed directly to:

Mr. Mark Elbertsen
105 Commerce Valley Drive West
7th Floor Markham, ON L3T 7W3

General comments can also be submitted via the ‘Contact Us ’ page or:

Email: ProjectTeam@QEWDixieDetailDesign.ca

Toll-Free Telephone Number: 1-855-418-9454

Comments are being collected to assist MTO with the design and to meet the requirements of the Ontario Environmental Assessment Act. This material will be maintained on file for use during the project and may be included in project documentation. Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. If you have any accessibility requirements in order to participate in this project, please contact one of the Project Team members listed above.

Public Information Centre #1 Summary Report

Click on the link below to download a copy of the PIC Summary Report.

Meetings

Consultation with municipalities, regulatory agencies, Indigenous Communities, and other interest groups are being undertaken during this project and will focus on data collection, design details, construction staging plan, and the development of mitigation measures to avoid or reduce potential impacts.

Design and Construction Report (DCR)

A Design and Construction Report (DCR) was prepared for Contract 1 (QEW from west of Etobicoke Creek Bridge to The East Mall) which documented the study process, design details, environmental impacts and mitigation measures, and a summary of consultation undertaken.

The DCR was available for a 30-day public review period commencing March 22, 2018. A separate DCR will be prepared for Contract 2 (QEW from west of Cawthra Road to west of Etobicoke Creek Bridge) at a later date.

Click on the link below to download a copy of the DCR for Contract 1.