Public Information Centre
A Public Information Center (PIC) was held in December 2017 and presented information on the recommended Detail Design Plan, construction staging details, and proposed mitigation measures to address potential environmental effects. 

Click on the links below to download a copy of the Display Panels and Roll Plan presented at the PIC.

Public Information Centre – Display Panels
Public Information Centre – Roll Plan

Public Information Centre Summary Report

Click on the link below to download a copy of the PIC Summary Report.
Public Information Centre Summary Report – March 2018

Meetings
Consultation with municipalities, regulatory agencies, First Nation Communities, and other interest groups will be undertaken during this project and will focus on data collection, design details, construction staging plan, and the development of mitigation measures to avoid or reduce potential impacts.

Design and Construction Report (DCR)

A Design and Construction Report (DCR) was prepared for Contract 1 (QEW from west of Etobicoke Creek Bridge to The East Mall) which documented the study process, design details, environmental impacts and mitigation measures, and a summary of consultation undertaken.

The DCR was available for a 30-day public review period commencing March 22, 2018. A separate DCR will be prepared for Contract 2 (QEW from west of Cawthra Road to west of Etobicoke Creek Bridge) at a later date.

Click on the link below to download a copy of the DCR for Contract 1.

Design and Construction Report (DCR) – March 2018

 